On-Time Delivery of CCGT Facilities

inside the project

The Kokosing family of companies are your combined cycle contractor. We utilize our workforce to self-perform all work including site civil, concrete foundations, structural steel erection, HRSG erection, electrical, instrumentation and controls, equipment setting, start-up and commissioning. In addition to self-performing construction of the facility, Kokosing’s Central Engineering Group contributes experience in Design-Build of onsite treatment plants, site utilities and buildings; along with permitting, clash detection through BIM and logistics expediting. The Kokosing team has contributed to a range of combined cycle facilities in challenging, schedule driven environments including:

  • PSEG Waterford Energy Center, Waterford, Ohio
  • Fayette Energy Center, Masontown, Pennsylvania
  • Dominion Dresden Energy Center, Dresden, Ohio
  • PSEG Lawrenceburg Generating Station, Lawrenceburg, Indiana
  • Hanging Rock Energy Facility, Ironton, Ohio

 

why it matters

As a self-performing general contractor in the power industry for over 35 years, we provide turn-key construction services for grassroot facilities and capacity expansion projects in this region. The resurgence of gas power brings jobs and lower cost power to our communities. The U.S. power industry is becoming increasingly reliant on CCGT plants for the majority of its capacity additions. Natural gas-fired plants are expected to have a significant increase of total provided energy capacity in the U.S.